Reconstruction of the production building for slaughtering pigs and cutting meat. Construction of a logistics warehouse, Belgorod region.
The work was carried out on a subcontract JSC «Johnson controls»
Executed work:
Installation and commissioning of the cooling and ventilation system (engine room and condenser area). Supply and installation of process equipment, pipelines and ventilation. Electrical work. Mounted cascade refrigeration R717/R744 (NH3/CO2)
Low temperature installation R744 (CO2)
Medium temperature unit R717 (NH3).