
Construction of a new complex for slaughter and processing of cattle meat, Bryansk region.
The work was carried out on a subcontract JSC «Johnson controls»
Executed work:
Preparation of design and working documentation of the cooling system of the complex. Installation and connection of refrigeration equipment. The connection of the air coolers. Connection of tile, box and pallet freezers. Ventilation system for the engine room. Installation and connection of control and power panels of the refrigeration system. Design of cascade refrigeration unit R717 / R744 (NH3 / CO2)
- Low temperature installation R744 (CO2)
- Medium temperature unit R717 (NH3).
Photogallery